Key Publications

Sort by: Show publications containing:

Task 24 – Subtask 1: The Monster Storybook

18 January 2014

Task 24 – Subtask 1: The Monster Storybook is a published summary showing examples of case studies, recommendations and evaluation metrics from the domains building retrofits, smart meter/feedback, SMEs and transport.


Task 24 – Subtask 1: The ‘Monster’ Case Study Analysis

15 November 2013

Task 24 – Subtask 1: The ‘Monster’, as we fondly call it, is our Case Study Analysis showing how different models of understanding behaviour or theories of change were applied – explicitly or implicitly to real-life interventions in the domains building retrofits, smart meter/feedback, SMEs and transport.


Task 17 – Subtask 8 Report – Assessment of the quantitative effect on the power systems and stakeholders – case studies from Austria and Finland

24 November 2012

Task 17 – Subtask 8 Report – Assessment of the quantitative effects on the power systems and stakeholders – case studies from Austria and Finland


Task 17 – Subtask 5 Report No. 1 – Full electric and plug-in hybrid electric vehicles from the power system perspective

24 November 2012

Task 17 – Subtask 5 Report No. 1 – Full electric and plug-in hybrid electric vehicles from the power system perspective


Task 17 – Subtask 5 Report No. 2 – Micro-CHP technologies for distributed generation

24 November 2012

Task 17 – Subtask 5 Report No. 2 – Micro-CHP technologies for distributed generation


Task 17 – Subtask 5 report No. 3 – Heat pumps for cooling and heating

24 November 2012

Task 17 – Subtask 5 report No. 3 – Heat pumps for cooling and heating


Task 17 – Subtask 5 Report No. 4 – Photovoltaic at customer premises

24 November 2012

Task 17 – Subtask 5 Report No. 4 – Photovoltaic at customer premises


Task 17 – Subtask 5 Report No. 5 – Smart metering

24 November 2012

Task 17 – Subtask 5 Report No. 5 – Smart metering


Task 17 – Subtask 7 Report – Stakeholders involved in the deployment of microgeneration and new end-use technologies

24 November 2012

Task 17 – Subtask 7 Report – Stakeholders involved in the deployment of microgeneration and new end-use technologies


Task 17 – Subtask 9 – Summary and conclusions

24 November 2012

Task 17 – Subtask 9 – Summary and conclusions


Page 7 of 9« First...56789