Task 17

Sort by: Show publications containing:

IEA DSM Task 17 – Subtask 13: Conclusion and Recommendations

12 October 2016

Executive Summary

Use cases for combining application of DG-RES, DR and storage technologies in commercial and grid operation for providing demand side flexibility on various timescales and aggregation levels have been assessed in IEA DSM Task 17 Phase 3. Technologies have been also investigated in terms of financial and technological implementation potential as well as their availability.

(more…)


IEA DSM Task 17 – Subtask 12: Best Practices and Lessons Learned

12 October 2016

Executive Summary

This document is the third report of the Task 17 deliverables. Real-world implementations are analyzed and lessons learned are captured. Based on collected information from pilots that were presented during conferences and workshops organized by the Task 17 team, the results and findings of these finished projects are further analyzed in terms of effectiveness. The analysis is in terms of the local context of the participating country and the benefits of aggregation in real-world living lab environments with different types of individual demand response technologies. There are a number of lessons learned from these experiences.

(more…)


IEA DSM Task 17 – Subtask 11: Valuation Analysis of Residential Demand Side Flexibility

12 October 2016

Executive Summary

The document starts with background about the ongoing transition of the energy system and demand response integration. Use cases on how flexibility can create value are discussed in details with respect to each actor and their corresponding roles, with some examples given. These use cases are markets, network operators, customers and the society. Coordination schemes and their introduction and design of markets are presented and analyzed.

A detailed study on existing valuation schemes and cost-benefit analysis frameworks with a summary and overview of boundary conditions and scenarios is part of chapter 4. This is supported by an extensive number of existing valuations of smart grid projects with a particular focus on residential demand response.

The document continues on the subtask 10 deliverable that describes actors and their roles, as well as potentials which can be further translated into commercial and grid operation cost/benefit analyses.


IEA DSM Task 17 – Subtask 10: Roles and Potentials of Flexible Consumers and Prosumers

12 October 2016

Executive Summary

Use of active end-user flexibility in electricity demand, supply or storage at the residential level is still in its infancy. User acceptance issues, market design and regulation, grid and market operational constraints, technical issues with communication protocols and response automation and, as a result of that, the lack of appropriate sound business models form tantalizing challenges for DSM. With the new world-wide de-carbonization agreements, new additional objectives and constraints are added to the supply/demand optimization schemes for the electricity system to include environmental and resiliency targets.

This document is the first in a series to introduce how value creation in power systems of end user flexibility can be enhanced. It functions as a preface by describing the interfaces, roles, and potentials of providing flexibility services. The role of residential end-user equipment in buildings in providing flexibility services in the future energy system is identified. Technical potentials (kW and kWh) of distributed energy resources (distributed generation, storage, and responsive load) are also included in this analysis. Moreover, identified technologies are assessed regarding their potential applicability and maturity in the context of different technical and commercial frameworks.

The document is the prelude to the subtask 11 deliverable that describes how these potentials can be further translated into commercial and grid operation cost/benefit analyses.


Task 17: Task flyer

26 February 2014

Task flyer – updated February 2014


Task 17: PowerMatching City

23 November 2012

case 2


NPP Spain – Task 17 – Phase 2

2 February 2010

NPP Spain – Task 17 – Phase 2


NPP Finland – Task 17 – Phase 2

7 November 2009

Finland – Task 17 – Phase 2


Page 2 of 212